PEDESTRIAN PASSAGE ON THE 23RD KM OF THE HIGHWAY “LENINGRADSKOE”

PEDESTRIAN PASSAGE ON THE 23RD KM OF THE HIGHWAY “LENINGRADSKOE”

Application of composite materials in a bridge

Plank

Dimensions of the structure

— Length: 56,8m
— Width: 3,92m
— Area: 228 m²
— Weight: 8,5 tones (concrete deck = 150tones)
— One raise assembly
— 12% reduction of erection costs (calculation of “Gormost”)

Date of putting into operation

December of 2005

Location

23rd km of the highway “Leningradskoe”, Moscow region

Certificates

     

Ëåíèíãðàäñêîå øîññå 23 êì. (23rd km of the highway “Leningradskoe”)

Ïåøåõîäíûé ïåðåõîä íà Ëåíèíãðàäñêîì øîññå 23-é êèëîìåòð Ïåøåõîäíûé ïåðåõîä íà Ëåíèíãðàäñêîì øîññå 23-é êèëîìåòð Ïåøåõîäíûé ïåðåõîä íà Ëåíèíãðàäñêîì øîññå 23-é êèëîìåòð Ïåøåõîäíûé ïåðåõîä íà Ëåíèíãðàäñêîì øîññå 23-é êèëîìåòð
    
Products and proposals
Railways
Highways
Bridge engineering
Infrastructure
Power engineering and communication
Transport
Construction profiles
Renovation and repairing
Subway
Catalogue of products
About Company
Mission
Structure
History
Partners
Awards
Special economic zone
Science & Technology Testing Center
Nanotechnologies
Adhesive prepregs
Polymer resins
Mathematical simulation
Vacuum infusion
Pultrusion
Testing and approval
Mass Production
Mass production technologies
Mass products
Competitive advantage of composite materials
Press Center
News
Contacts
 
November 29th, 2013

November 26th, 2013

November 1th, 2013

RailwaysHighwaysBridge engineeringInfrastructurePower engineering and communicationTransportSubway
+7 (495) 287-12-92; 287-12-93; 287-12-94
© Apatech — Applied Advanced Technology Company Ltd., 2005—2007. All rights reserved.
Russia, 107078, Moscow,
Novaia Basmannaia 14 str. 2