November 1th, 2013 The pedestrian crossing at the 553 km of the Ì-4 Don Highway, the Voronezh Region, was put into operation.
The pedestrian crossing at the 553 km of the Ì-4 Don Highway, the Voronezh Region, was put into operation.
All news