Increase of traffic capacity during repair and reconstruction of bridges

Mobile pedestrian passages and highway overpasses

9m-section


6m-section


— Bridge weight: pedestrian bridge 110 êã/ì², highway bridge 170 110 êã/ì²;
— Duration period of assembly and disassembly: 1 – 2 days;
— The quantity id assemblies and disassemblies: not less than 20 times;
— Minimum building area and support dimensions;
— Open air storage.
Products and proposals
Railways
Highways
Bridge engineering
Infrastructure
Power engineering and communication
Transport
Construction profiles
Renovation and repairing
Subway
Catalogue of products
About Company
Mission
Structure
History
Partners
Awards
Special economic zone
Science & Technology Testing Center
Nanotechnologies
Adhesive prepregs
Polymer resins
Mathematical simulation
Vacuum infusion
Pultrusion
Testing and approval
Mass Production
Mass production technologies
Mass products
Competitive advantage of composite materials
Press Center
News
Contacts
 
November 29th, 2013

November 26th, 2013

November 1th, 2013

RailwaysHighwaysBridge engineeringInfrastructurePower engineering and communicationTransportSubway
+7 (495) 287-12-92; 287-12-93; 287-12-94
© Apatech — Applied Advanced Technology Company Ltd., 2005—2007. All rights reserved.
Russia, 107078, Moscow,
Novaia Basmannaia 14 str. 2