Increase of traffic capacity during repair and reconstruction of bridges
Mobile pedestrian passages and highway overpasses
9m-section
6m-section
— Bridge weight: pedestrian bridge 110 êã/ì², highway bridge 170 110 êã/ì²;
— Duration period of assembly and disassembly: 1 – 2 days;
— The quantity id assemblies and disassemblies: not less than 20 times;
— Minimum building area and support dimensions;
— Open air storage.