October 30th, 2013 The pedestrian crossing at the 6 km of the Ì-6 “Caspian” Highway near Tambov was put into operation.
The pedestrian crossing at the 6 km of the Ì-6 “Caspian” Highway near Tambov was put into operation.
All news