- Protection of the railway track from the 8-point storm
- Creation of the second railway track without traffic interruption
- 8-10-time reduction of erection period
- Life cycle is 70-100 years
- Test maintenance of the composite seaside wall under the marine climate and sandy-pebble erosion
- Monitoring of the wall behavior with the help of sensors installed into the material
Project developed by ApATeCh for erection near Tuapse |
|
|
The old reinforced concrete sea wall |
New sea wall on the railway track Tuapse - Shepsi |
Integrated control system of the structure condition
- Condition and behaviour control of the structure during its service life
- Estimation of the load level in the anchors
- Analysis of the wall behaviour during wave action
|
|
The design was developed under supervision of the department «Track and railway equipment» of the Moscow Institute of railway communications
October 21-th, 2008 Beginning of the sea wall installation on the railway track “Tuapse – Adler”
December 28th, 2008 The end of the installation of the sea walls on the railway track “Tuapse – Adler”